Received 20 October 2026
NP/26/0549/DOC
Discharge of condition No. 3 of NP/23/0618/S73 (Construction Method Statement)
Waiting for a decision
Received 20 October 2026
NP/26/0547/FUL
Alterations to shop front to remove polished stone cladding polished aluminium arch glazing and replacement with traditional timber design including pilasters and capitals, fascia panels etc to match Tenby heritage features
Waiting for a decision
Received 20 October 2026
NP/26/0551/DOC
Discharge of condition No. 6 of NP/25/0433/FUL - Written Scheme of Investigation (WSI)
Waiting for a decision
Received 20 October 2026
NP/26/0548/LBA
Alterations to shop front to remove polished stone cladding polished aluminium arch glazing and replacement with traditional timber design including pilasters and capitals, fascia panels etc to match Tenby heritage features
Waiting for a decision
Received 19 October 2026
NP/26/0552/DOC
Discharge of condition No. 7 of NP/26/0274/FUL - Location of bat & bird boxes & reptile Refugia
Waiting for a decision
Received 19 October 2026
NP/26/0546/TCA
Remove small Sycamore & Elder tree on driveway of Y Bont, Remove dead wood from Ash tree over hanging bridge & bench, remove branches of large Ash behind cottage, remove cluster of 8-10 small Ash trees on roadside near Ty'r Perern
Waiting for a decision
Received 19 October 2026
NP/26/0545/TCA
Prune back overhanging Sycamore branches to above 5.2m, fell cluster of 3 small Ash trees to avoid debris falling onto highway
Waiting for a decision
Received 16 October 2026
NP/26/0537/OBS
Installation of lamp post with 4G & 5G OMNI Antennas with standalone feeder pillar under Regulation 5 of the Electronic Communications Code
Waiting for a decision
Received 15 October 2026
NP/26/0536/FUL
Proposed Change of Use from 20 Tent Pitches to 16 Static Units inc. regularisation of 4 Static Caravans and Landscaping Enhancements
Waiting for a decision
Received 14 October 2026
NP/26/0530/NMA
Non material amendment to NP/25/0572/FUL - Replace the North and East elevations wall timber cladding with a vertical powder coated steel green box cladding
Waiting for a decision
Received 14 October 2026
NP/26/0535/TCA
Proposed tree and shrub works in Solva Conservation area. 1) Chestnut tree in garden, overhanging road and potentially property. 2) Holly bush in conservation area growing to disproportional size next to public path.
Waiting for a decision
Received 13 October 2026
NP/26/0528/FUL
Alterations to the existing conservatory and erection of a ground floor extension at Station Cottage.
Waiting for a decision
Received 12 October 2026
NP/26/0525/FUL
Reprofiling of an agricultural enclosure, with raising of ground levels with excavated soils from adjacent residential development, for agricultural improvement, together with re-landscaping works
Waiting for a decision
Received 12 October 2026
NP/26/0523/FUL
Erection of a two-storey extension to an existing two-storey property, including an adjacent single-storey element with a roof terrace incorporating an air source heat pump, and replacement of existing concrete roof tiles with natural slate.
Waiting for a decision
Received 12 October 2026
NP/26/0522/TCA
Ash tree removal to stump
Waiting for a decision
Received 12 October 2026
NP/26/0524/FUL
Remodelling of existing dwelling
Waiting for a decision
Received 9 October 2026
NP/26/0517/FUL
Change of use of the existing annex to short-term holiday accommodation (Class C6), alterations to the internal layout and fenestration, erection of a single-storey infill extension, and installation of solar PV panels, battery storage, air-source heat pumps and rainwater harvesting
Waiting for a decision
Received 8 October 2026
NP/26/0518/DOC
Discharge of condition No. 3 of NP/25/0156/FUL (Landscape Management Plan)
Waiting for a decision
Received 8 October 2026
NP/26/0519/DOC
Discharge of condition No. 6 of NP/25/0156/FUL (Precautionery Working Method Statement)
Waiting for a decision
Received 8 October 2026
NP/26/0515/DOC
Discharge of condition No. 3 (Phasing Plan), No. 5 (Construction Traffic Management Plan), No. 6 (Radon Investigation Scheme), No. 8 (Landscaping Scheme), No. 9 (Green Roof Scheme), No. 11 (External Materials Samples), No. 16 (Tree Protection), No. 18 (Stone Wall Curtiliage), No. 19 (Barn K Curtliage) & No. 23 (External Lighting) of NP/24/0485/FUL
Waiting for a decision
Received 7 October 2026
NP/26/0514/FUL
Erection of a two-storey dwelling and a detached single-storey Garden Room annex
Waiting for a decision
Received 7 October 2026
NP/26/0513/DOC
Discharge of Condition 4 of NP/25/0433/FUL (scheme relating to restoration of all boundary breaches involving existing Pembrokeshire hedgebank structures)
Approved with conditions
Received 6 October 2026
NP/26/0543/PNC
28 day camping
Waiting for a decision
Received 2 October 2026
NP/26/0508/FUL
Slate hanging of South facing gable wall & replacement of upstairs window.
Waiting for a decision
Received 2 October 2026
NP/26/0511/DOC
Discharge of condition No. 3 of NP/26/0368/FUL - Precautionary Working Methods Statement (PWMS)
Waiting for a decision
Received 2 October 2026
NP/26/0506/TCA
Removal of Corsican Pine Tree to the rear - Roots are causing structural damage to wall & footpath
Waiting for a decision
Received 2 October 2026
NP/26/0510/LBA
Slate hanging of South facing gable wall and replacement of upstairs window.
Waiting for a decision
Received 1 October 2026
NP/26/0505/FUL
Retrospective application for a canopy used as Outdoor Kitchen/ Amenity Facility
Waiting for a decision
Received 1 October 2026
NP/26/0504/FUL
Proposed rooflights, replacement windows, rear access ladder and replacement of rear canopy
Waiting for a decision
Received 1 October 2026
NP/26/0502/PNA
Replacement agricultural building
Approved
Received 30 September 2026
NP/26/0500/DOC
Discharge of condition No. 3 (Materials) & No. 4 (Biodiversity) of NP/21/0778/FUL
Waiting for a decision
Received 30 September 2026
NP/26/0496/OBS
60MJ393 A Sycamore Tree Cutting
Approved
Received 29 September 2026
NP/26/0521/FUL
Replacement cattle housing shed
Waiting for a decision
Received 29 September 2026
NP/26/0498/DOC
Discharge of condition No. 9 of NP/26/0074/FUL - Construction Traffic Management Plan (CTMP)
Waiting for a decision
Received 29 September 2026
NP/26/0499/ADV
One standing interpretation board outlining the ecology and conversation practices for the Western Barbastelle bat
Waiting for a decision
Received 29 September 2026
NP/26/0497/ADV
One standing interpretation board outlining the ecology and conservation practices for the Western Barbastelle bat
Waiting for a decision
Received 28 September 2026
NP/26/0509/FUL
Replacement livestock shelter
Waiting for a decision
Received 28 September 2026
NP/26/0492/NMA
Amendments to NP/25/0149/FUL due to safeguarding of retained trees
Approved with conditions
Received 24 September 2026
NP/26/0490/FUL
Replace roof and install rooflights; remove chimney and replace with steel flue; removal of conservatory and replace with new extension; addition of rear porch
Waiting for a decision
Received 24 September 2026
NP/26/0489/FUL
Alterations to existing access and driveway
Waiting for a decision