Mae penderfyniad wedi'i wneud, felly nid yw'r cyngor yn derbyn sylwadau mwyach. Caniatawyd gydag amodau, 1 Gorffennaf 2026.
Cais yn dod i law
Mae'r cyngor yn gwirio bod y cais yn gyflawn ac yn rhoi rhif cyfeirnod iddo.
Ymgynghori
Mae'r cyngor yn rhoi gwybod i gymdogion ac eraill, fel arfer gyda hysbysiad safle neu lythyrau. Gall unrhyw un roi sylwadau, fel arfer o fewn 21 diwrnod.
Penderfyniad
Mae'r rhan fwyaf o geisiadau'n cael eu penderfynu gan swyddogion cynllunio'r cyngor. Mae rhai mwy neu ddadleuol yn mynd i'r pwyllgor cynllunio, lle mae cynghorwyr yn penderfynu'n gyhoeddus.
Ar ôl y penderfyniad
Os gwrthodir caniatâd, gall yr ymgeisydd apelio i Benderfyniadau Cynllunio ac Amgylchedd Cymru. Ni all pobl eraill apelio, ond gallan nhw roi sylwadau ar apêl.
Daeth i law 3 Gorffennaf 2026
0/53525
Approval of condition no 3 (Written Method Statement) of Listed Building Consent 0/52184 (The reinstatement of floors and roofs in the East Wing and West Wing, which is referred to as Application 02. The works comprise: - Conservation-led repair works and removal of high-level vegetation - Localised re-pointing in lime mortar, based on recent trials and evidence - New roof structure, combining a mix of traditional and contemporary structural elements, including integration of insulation - Reinstatement of roof finishes. Gutters are increased in capacity to reflect current rainfall and storm events. - New rainwater goods. These will involve a combination of lead chutes/overflows (through parapets), cast iron hoppers and downpipes - Conservation of the remaining floors and reinstatement of floors where missing - Recording and retention of remaining plasterwork and joinery elements, and consequently holding/conservation works where required - New below ground drainage connections (as indicated on drainage plan) - Holding/conservation works to the existing window frames and temporary glazing to windows, with some localised reinstatement - No foul drainage is proposed as part of these works (Listed Building Consent)
Caniatawyd0 m
Daeth i law 3 Gorffennaf 2026
0/53524
Approval of condition no 3 (Written Method Statement) of Listed Building Consent 0/52182 (The reinstatement of floors and roofs in the Castle Core, which is referred to as Application 01. The works comprise: - Conservation-led repair works and removal of high-level vegetation - Localised re-pointing in lime mortar, based on recent trials and evidence - New roof structure, combining a mix of traditional and contemporary structural elements, including integration of insulation - Reinstatement of the keep wall and towers, and the southern wall of the kitchen courtyard, where previously collapsed. - Reinstatement of roof finishes. Gutters are increased in capacity to reflect current rainfall and storm events. - New rainwater goods. These will involve a combination of lead chutes/overflows (through parapets), cast iron hoppers and downpipes - Conservation of the remaining floors and reinstatement of floors where missing - Recording and retention of remaining plasterwork and joinery elements, and consequently holding/conservation works where required - New below ground drainage connections (as indicated on drainage plan) - Holding/conservation works to the existing window frames and temporary glazing to windows, with some localised reinstatement - No foul drainage is proposed as part of these works" .(Listed Building Consent))
Caniatawyd0 m