Received 27 August 2026
26/24883/CON
Variation of Conditions 3 (External Material Samples), 4 (Hard Landscaping Features), 5 (Parking), 6 (Offsite Highway Works), 7 (Access) and 9 (vehicle Access) pursuant to planning application 22/21558/REM
Approved
Received 27 August 2026
26/24882/CON
Variation of Conditions 4 (LEEMP), 5 (Construction Phase Environmental Management Plan), 6 (Method Statement), 7 (External Lighting), 9 (Tree Protection Plan), 10 (Public Sewerage), 11 (Construction Method Statement), 14 (Contamination), 15 (Remediation Scheme), 17 (Contamination Monitoring and Maintenance Method Statement), 18 (Footway) pursuant to planning application 17/14686/OUT.
Waiting for a decision
Received 27 August 2026
26/24884/DISCON
Discharge of Condition 2 (Advertisement Sample) pursuant to approved Advertising Consent 26/24528/ADV
Approved
Received 26 August 2026
26/24878/CON
Variation of condition 2 pursuant to planning permission 13/08963/FUL. Replace approved plan NP5V2 with submitted plan.
Waiting for a decision
Received 26 August 2026
26/24877/FUL
Proposed rear single storey extension to replace existing single storey upvc roofed extension
Waiting for a decision
Received 26 August 2026
26/24875/FRI
Alterations and repairs, new extensions, reversal of modern alterations, replacement windows and forming new doorways. The application also incorporates the addition of a glazed porch to the side elevation and a new garage building in the form of a traditional walled garden, a padel court and associated pavilion. (Listed Building application)
Approved
Received 26 August 2026
26/24876/FRI
Alterations and repairs, new extensions, reversal of modern alterations, replacement windows and forming new doorways. The application also incorporates the addition of a glazed porch to the side elevation and a new garage building in the form of a traditional walled garden, a padel court and associated pavilion. (Full Planning Application)
Approved
Received 25 August 2026
26/24873/FRI
Deadline 29.09.2026 - Construction of Lan Fawr Energy Park, comprising up to 55 turbines up to 220 metres (m) tip height and associated infrastructure.
Approved
Received 25 August 2026
26/24870/FUL
Received 25 August 2026
26/24873/FRI
Deadline 29.09.2026 - Construction of Lan Fawr Energy Park, comprising up to 55 turbines up to 220 metres (m) tip height and associated infrastructure.
Approved
Received 24 August 2026
26/24867/CPL
Installation of solar panels to main dwelling roof on front and rear elevations.
Waiting for a decision
Received 21 August 2026
26/24828/FUL
1. The installation of a number of solar panels on south facing roof. 2. The installation of two velux windows on the south facing side of the roof and two velux windows on the north facing side of the roof.
Waiting for a decision
Received 21 August 2026
26/24864/FUL
Change of use of a decommissioned police station to Accountants
Approved
Received 21 August 2026
26/24865/FUL
Change of use of accountancy practice to allow extended and improved residential accommodation at Brooklands, Hay on Wye
Approved
Received 20 August 2026
26/24863/FUL
Erection of a double storey rear extension with single storey wrap around to side. Loft conversion comprising of a new dormer window to match new oak frame extension and existing roof. Erection of a double garage with studio above on existing garage plot to side. Replacing the existing balcony to front with a new hip roof to match existing tiles. New pitched roof over existing extension to match existing tiles. Boundary wall realignment with land ownership boundary and new timber post gates. New porch to front included also to match oak frame extension.
Waiting for a decision
Received 20 August 2026
26/24860/FUL
Proposed Cycle Store Extension
Waiting for a decision
Received 19 August 2026
26/24858/FUL
Conversion and alterations of an existing barn to a secure, pre-booked dog walking, training and exercise facility
Waiting for a decision
Received 19 August 2026
26/24861/FUL
Proposed Ablution Block Extension
Waiting for a decision
Received 18 August 2026
26/24856/DISCON
Discharge of Condition 3 (Access), 9 a and b (Archaeological) and 12 (Barn Owl Method Statement) pursuant to previously approved application 25/23781/FUL.
Approved with conditions
Received 18 August 2026
26/24849/AGR
Received 14 August 2026
26/24852/LBC
Replacement of all existing windows to the front and rear elevations, together with the front entrance door, guttering and fascia boards, refurbishment of two barn-style garage doors, installation of six bollards to the front of the property, and replacement of the concrete paving slabs to the rear courtyard with natural stone paving.
Waiting for a decision
Received 14 August 2026
26/24850/TPO
Crown reduction to both trees (Silver birch and Field Maple) protected under TPO 64, 2025
Approved
Received 14 August 2026
26/24853/FUL
Construction of a detached three-bay garage.
Waiting for a decision
Received 12 August 2026
26/24829/FUL
Carry out improvements and enhancements to the existing ancillary accommodation and related services along with provision of enhanced ecological provision
Waiting for a decision
Received 12 August 2026
26/24830/LBC
Carry out improvements and enhancements to the existing ancillary accommodation and related services along with provision of enhanced ecological provision
Waiting for a decision
Received 12 August 2026
26/24848/FUL
Change of Use of land to beer garden, provision of toilet block and covered walkway, decking and car park extension (retrospective).
Waiting for a decisionDecided by the planning committee
Received 12 August 2026
26/24847/FUL
A no-works planning application for the change of use of the former HSBC Bank in Brecon A2 to a Restaurant A3 and a dwelling C3(a)
Waiting for a decision
Received 11 August 2026
26/24845/DISCON
Discharge of Condition 7 (Landscape and Ecological Management Plan) pursuant to planning application 25/23748/FUL.
Approved
Received 10 August 2026
26/24842/CAC
Proposed removal of boundary wall and fencing to open up the space and enhancements to the memorial garden. Works associated with lowering Steeple Lane and wider relandscaping of Brecon Town Centre.
Waiting for a decision
Received 10 August 2026
26/24843/LBC
Strengthening of building and adaptations to create and improve bat roost.
Waiting for a decision
Received 10 August 2026
26/24840/LBC
Emergency work to roof covering and structure, external walls, flooring and structural frame to prevent further deterioration from excessive movement
Waiting for a decision
Received 7 August 2026
26/24838/CPL
Replace derelict tennis court with pump track
Approved
Received 7 August 2026
26/24701/FUL
Proposal is to extend existing wooden stable building by 30sqm (over the 10sqm allowable under permitted development 20m from house within Article 1(5) land) to provide additional storage and increasing the roof area to accept effective PV panel system in future. Existing wood boarding/cladding renewed with new (clear treated, natural).
Waiting for a decision
Received 6 August 2026
26/24836/DISCON
Discharge of conditions 3 (Biodiversity Enhancement Scheme) and 6 (CEMP) pursuant to approved planning permission 26/24607/FUL
Waiting for a decision
Received 6 August 2026
26/24576/FUL
Proposed Lean-To Spectator Stand and Associated Works
Approved
Received 4 August 2026
26/24826/AGR
Agricultural building to house farm machinery and feed
Approved
Received 4 August 2026
26/24824/FUL
Proposed refurbishment and expansion of existing guest accommodation and associated works
Waiting for a decisionDecided by the planning committee
Received 3 August 2026
26/24748/FUL
Proposed storage unit for agricultural machinery and implements, feed and severe weather shelter for livestock.
Waiting for a decision
Received 3 August 2026
26/24809/FUL
Replacing the wooden front door with a PVC one, and replacing the wooden windows with double glazed PVC ones with a higher rating.
Waiting for a decision
Received 31 July 2026
26/24821/FUL
Extension of an existing pond, construction of a new water overflow pond, and formation of additional hardstanding
Waiting for a decision