Application received
The council checks the application is complete and gives it a reference number.
Consultation
The council tells neighbours and others, usually with a site notice or letters. Anyone can comment, usually within 21 days.
Decision
Most applications are decided by the council's planning officers. Larger or disputed ones go to the planning committee, where councillors decide in public.
After the decision
If permission is refused, the applicant can appeal to Planning and Environment Decisions Wales. Other people can't appeal, but can comment on an appeal.
Only planning matters count in a decision: things like the look of a building, traffic, noise, overlooking, loss of light, and the council's local development plan. A fall in the value of a neighbouring home doesn't count, nor does who the applicant is.
Received 7 October 2010
E/23827
EXTENSION TO THE EXISTING PERMISSION FOR THE THREE BEDROOM ANNEXE TO BE USED AS A GRANNY ANNEXE AND/OR A HOLIDAY LET
Approved
Received 7 October 2010
S/23815
PROPOSED ERECTION OF EXTERNAL CANOPIES AROUND SELECTED AREAS OF THE SCHOOL
ApprovedDecided by the planning committee
Received 7 October 2010
S/23816
DEMOLITION OF EXISTING FARMHOUSE AND GARAGE AND PROPOSED NEW DWELLING HOUSEAND GARAGE
ApprovedDecided by the planning committee
Received 7 October 2010
S/23818
REMOVAL OF SINGLE STOREY GARAGE AND CONSTRUCTION OF TWO STOREY SIDE EXTENSION AND REAR SUN LOUNGE EXTENSION
Approved
Received 7 October 2010
S/23819
Received 7 October 2010
S/23821
Received 7 October 2010
W/23822
EXTENSION TO REAR OF DWELLING
ApprovedDecided by the planning committee
Received 6 October 2010
S/23805
PROPOSED TWO STOREY AND SINGLE STOREY SIDE EXTENSION TO PROVIDE GROUND FLOOR KITCHEN, DINING ROOM AND INTEGRAL GARAGE AND TWO FIRST FLOOR BEDROOMS
Approved
Received 6 October 2010
S/23806
PROPOSED SINGLE STOREY EXTENSION TO THE SIDE OF THE EXISTING INTEGRAL GARAGE
Approved
Received 6 October 2010
S/23809
THE REMOVAL OF THE EXISTING TUBULAR STEEL LOW HEIGHT TROLLEY ENCLOSURES AND THE INSTALLATION OF NEW COVERED TROLLEY BAYS
Approved
Received 5 October 2010
W/24044
THE INSTALLATION OF SOLAR PANELS (ENERGY CAPACITY) ON SOUTH FACING TIN ROOF
Approved
Received 5 October 2010
S/23803
VARIATION OF CONDITION NO. 5 OF PLANNING PERMISSION S/17744 FOR CHANGE OF USE OF BARNS 1 & 2 TO HOLIDAY ACCOMMODATION AND CONSTRUCTION OF GARAGES - TO ALLOW BARN 1 TO BE USED AS RESIDENTIAL
Approved with conditions
Received 5 October 2010
S/23804
Received 5 October 2010
S/24460
Received 4 October 2010
S/23362
SINGLE STOREY REAR EXTENSION TO FORM A HORSE EXAMINATION STABLE AND STORAGE ROOM
ApprovedDecided by the planning committee
Received 4 October 2010
S/23611
RESIDENTIAL DEVELOPMENT
ApprovedDecided by the planning committee
Received 1 October 2010
S/23798
Received 1 October 2010
S/23799
Received 1 October 2010
S/23800
TWO STOREY REAR EXTENSION
Approved
Received 1 October 2010
S/23801
CHANGE OF USE OF CALSONIC CANTEEN BUILDING INTO A PERMANENT BASE FOR LLANELLI GYMNASTICS CLUB
Approved
Received 30 September 2010
E/23392
RESIDENTIAL DWELLING (RENEWAL OF APPLICATION E/15716 APPROVED 09.08.07)
ApprovedDecided by the planning committee
Received 30 September 2010
E/23794
DOUBLE STOREY REAR EXTENSION AND ORANGERY
Approved
Received 30 September 2010
E/23795
Received 30 September 2010
E/23796
Received 30 September 2010
E/23797
MAJOR REPAIRS COMPRISING THE RECOVERING OF THE ROOF WITH NEW NATURAL SLATES INTRODUCING VAPOUR PERMEABLE ROOFING FELT, LOCAL REPAIRS TO ROOF STRUCTURE INCLUDING IMPROVING INADEQUATE BEARINGS TO PRINCIPLE TRUSSES, INTRODUCTION OF MAINTENANCE WALKWAY IN ROOF VOID, HIDDEN STRENGHTHENING OF WALLS WHERE CRACKED, REBUILDING OF DETERIORATED WINDOWS, REPLACEMENT OF LATER HOPPER VENTS IN WINDOWS WITH REINSTATEMENT OF OPENING SASHES, MOVING OF HAZARDOUSLY SITED RADIATORS, FLOOR REPAIRS AND EMERGENCY REPAIRS TO ADJOINING DERELICT CHAPEL HOUSE
Refused
Received 30 September 2010
S/23586
PROOSED REAR KITCHEN AND BEDROOM EXTENSION AND FRONT DRIVE/PARKING AREA
Approved
Received 30 September 2010
W/23789
CHANGE OF USE OF AGRICULTURAL BUILDING TO FORM DOG KENNELS
Refused
Received 30 September 2010
W/23790
Received 30 September 2010
W/23791
INSTALLATION OF APPROX 30M SQ OF PHOTOVOLTAIC SOLAR PANELS ON SOUTH WEST FACING ROOF OF THE MILLENIUM HALL
Approved
Received 30 September 2010
W/23793
Received 29 September 2010
W/24020
PROPOSED WIDENING/ALTERATION TO EXISTING SITE ENTRANCE TO FORESTRY
Approved
Received 29 September 2010
E/23783
Received 29 September 2010
E/23785
RETENTION OF THE CHANGE OF USE OF AGRICULTURAL LAND TO A MENAGE AND ASSOCIATED HARDSTANDING (Retrospective)
Approved
Received 29 September 2010
W/23784
INSTALLATION OF SOLAR PANELS
Approved
Received 29 September 2010
W/23787
VARIATION OF CONDITION 2 ATTACHED TO PLANNING PERMISSION W/16994 (CONSTRUCTION OF 153 DWELLINGS AND ASSOCIATED WORKS) - ALTERATIONS TO HOUSING TYPE AND ORIENTATION AT PLOTS 1 AND 95
Approved with conditions
Received 28 September 2010
S/23781
PROPOSED DEVELOPMENT OF THE CROSSHANDS EAST STRATEGIC EMPLOYMENT SITE (SES) ACCESS ROAD, COMPRISING A NEW 7.3M SINGLE CARRIAGEWAY ROAD, VERGE, FOOTPATH/CYCLEWAY, NEW CROSSHANDS BUSINESS PARK FOUR ARM ROUNDABOUT JUNCTION, GATED LIVESTOCK ACCESS, NEW GHOST ISLAND PRIORITY JUNCTION TO THE PROPOSED SES, NEW SIMPLE PRIORITY JUNCTION ON TO BLACK LION ROAD, NEW SIMPLE PRIORITY JUNCTION ON TO HEOL PARC MAWR, GHOST ISLAND PRIORITY JUNCTION AT MEADOWS ROAD, FOOTPATHS, LIGHTING, DRAINAGE, RETENTION POND, LANDSCAPING, RETAINING WALLS, SITE REMEDIATION, PLUS ASSOCIATED ENGINEERING OPERATIONS.
ApprovedDecided by the planning committee
Received 28 September 2010
W/23779
DISCHARGE OF CONDITIONS NOS 6, 27, 35, 40, 46, 47, 57, 58 & 59 ON PLANNING PERMISSION C/21/97
Approved with conditionsDecided by the planning committee
Received 28 September 2010
W/23780
CONSTRUCTION OF NEW ACCESS TO CRWBIN QUARRY OFF THE B4306
ApprovedDecided by the planning committee
Received 28 September 2010
W/23782
PROPOSED DEVELOPMENT OF INDUSTRIAL PARK, INCLUDING THE DEVELOPMENT OF BUSINESS AND INDUSTRIAL UNITS (USE CLASSES B1 AND B8), OFFICES, BUSINESS INCUBATOR UNITS, A HOTEL, A BUSINESS CENTRAL HUB, RESOURCE CENTRE, ENERGY CENTRE, CENTRAL GREEN SPACE, PARKLAND, ROADS, GATEWAY FEATURE, PEDESTRIAN AND CYCLING FACILITIES INCLUDING A GREEN LINK, LANDSCAPING, PROVISION OF FOUL AND SURFACE WATER DRAINAGE, ATTENUATION PONDS, SERVICES, UTILITIES, SITE REMEDIATION, PLUS ASSOCIATED ENGINEERING OPERATIONS.
ApprovedDecided by the planning committee
Received 24 September 2010
W/23771
LAWFUL OF DEVELOPMENT CERTIFICATE FOR AN EXISTING USE - DECKING
Approved